Scaffolding Installation Services
Scaffolding Erection & Maintenance
ASiA Consultants have now been delivering a premier contract scaffolding service for over 10 years and are an approved contractor with PETRONAS and Construction Industry Development Board (CIDB) for Scaffolding Erection Works and Maintenance.
Quite simply we aim to deliver a product of the highest standard, whilst maintaining a proactive approach toward all safety & health matters and consistently delivering exceptional levels of service to all our clients.
We specialize in Oil & Gas Industry for scaffolding works and are able to advise, plan and design scaffolding solutions to meet your needs.
We are able to supply DOSH competent Scaffolders for scaffolding installation works and materials which are in compliance with the Oil & Gas Industry.
Major Projects
Project | Supply of Manpower and Scaffolding Services for Acid Gas Thermal Oxidizer(AGTO) & Liquid Incinerator (LI) |
Client | Japan Gasoline Co. (JGC) Malaysia |
Location | LNG Train-9 Complex, Bintulu, Sarawak |
Scaffold Type | Tubular |
Period | May 2016 |
Description | Erection of two (2) tower scaffolding for the AGTO & LI unit in LNG 3 Train 9 in 15 days
Dismantling of two (2) tower scaffolding for the AGTO & LI unit in LNG 3 Train-9 in 10 days. |
Project | Piperack Suspended Scaffold Installation & Dismantling |
Client | Tecnicas Reunidas Malaysia |
Location | Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor |
Scaffold Type | Tubular |
Period | September 2016 |
Description | Completed erection of multi-layered and storied suspended scaffold on 1 Piperack (5760 m2) |
Project | Piperack Suspended Scaffold Installation & Dismantling |
Client | TOYO Engineering Malaysia |
Location | Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor |
Scaffold Type | Tubular |
Period | January -May 2017 |
Description | Completed erection of multi-layered and storied suspended scaffold on 3 Piperacks (21,052 m2) |
Project | Installation of Modular Scaffold for Column Insulation (C-402 & C-405) |
Client | TOYO Engineering Malaysia |
Location | Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor |
Scaffold Type | Modular (PERI-UP) |
Period | February – May 2018 |
Description | Partnering with PERI (Malaysia), ACTS had completed erection and dismantling of two column modular scaffolding for insulation works.
C – 402 Erection of scaffolding tower for COLUMN – 402 (110.0 m) C – 405 Erection of scaffolding tower for COLUMN – 405 (63.5 m) |